Blue Ox BX88272 ATM Fuse Bypass Switch with Long Lead
  • List Price: US $65
  • Price: US $54.65 & FREE Shipping

Product Description

Easy to install

Simply flip a switch and tow

2 levels of insulation

Safe design requires the fuse bypass switch to be as close to the fuse panel as possible

Heavy Duty Wiring

Learn what other customers say about this product  Read more